LED-circuit board specifically developed for the Scania +2016 Skylights.
The LED-circuit board comes with 6 meter cable with M8 connectors that can be connected to the included controller.
The controller manages the two colors, and automatically turn them off when you enable the strobe light.
The controller itself has 3 meter wire.
The cable has 4 wires:
- Minus - Green cable
- Plus for white position light - White cable
- Plus for yellow position light - Yellow cable
- Plus for strobe light - Brown cable
Mounting
Installing into the lamps is relatively easy
- The lamps have to be removed from the frames they are mounted in.
- Use the included drilling template on the bottom of the lamp
- Drill a 20mm hole and two 3.5mm holes.
- Make sure to remove any debris from the drilling.
- The LED-circuit board is put in to the lamp through the large hole.
- On the LED-circuit board, there is two solder-nuts, that is used for fastening the LED-circuit board, through the two small holes with the included M3 bolts.
- Make sure to add glue to the head of the bolts, to avoid water ingress.
Push up the rubber gasket, so that it is secured in the hole. It can be a benefit to put silicone grease in the gasket, to avoid water ingress.